KONE NanoSpace™elevator replacement process video

781,105
0
Published 2014-03-12
KONE NanoSpace™ elevator replacement process video demonstrating the main phases during the elevator replacement and installation process when an old elevator is replaced with new KONE NanoSpace elevator.

At KONE, our mission is to improve the flow of urban life. We provide elevators, escalators and automatic building doors, as well as solutions for maintenance and modernization to add value to buildings throughout their life cycle.
www.kone.com/
www.facebook.com/konecorporation/
www.linkedin.com/company/kone

All Comments (21)
  • @express777100
    first time i have seen a nanospace lift installed. it is a lot easier and less graft than we had to do in the 70s and 80s with high speed passenger lifts.
  • @DerSolinski
    Ohhhh smart. If I interpret this correctly the counterweights are a bit overbalanced to coax a bit more payload from the motor since this seems to be push/pull. Elegant system.
  • @doankara5672
    Great ideas and great solutions. Congratulations.
  • Já fui montador da kone .é já montei ese tipo de elevador. Excelente equipamento.
  • @1enterthedragon
    Depending on how many openings there is in hoist way of the new elevator, determine how long it takes to to build.. Not no 2 weeks from beginning to end.. No way..
  • @aquabestindian
    What would be the ball-park figure in INR for a six-story building?
  • @LandNfan
    I know of cable lift elevators and hydraulic elevator for just a few floors. But I have wondered why elevators did not use a jack screw mechanism. I suppose the flex in the drive screw would be a problem with taller installations. Screw drive would be very smooth and quiet with little car fall risk except for major structural failure.
  • Awesome technology nano space First time I saw this unic technology we hv seen monospace then mini space nano space experience of comfort
  • @jimmyzhang4854
    what kind of software is it for design and simulate elevatror?
  • @sautran1841
    0:00 Introduction 0:24 Site survey 0:39 Old elevator disassembly 1:55 Installation 2:30 Shaft components 2:57 Elevator controller 3:53 Hosting unit 4:11 Balancing weights KONE Nanospace More comfort in less time
  • @jimmyzhang4854
    someone please tell me the software to design this stuff and simulation
  • @Tee.NZ.07
    Lol the amount of pits I've seen in water..... 🤔 Looks cool tho
  • @Aawsomeguy
    When I saw the controller on the 1st floor right next to the elevator in a panel I then knew it was a MRL (Machine Room Less) system before the bottom mounted drive machine was even shown. They take much less power then the larger geared and gearless drive machines in a rooftop/basement elevator machine room.
  • KONE refuses to pay anything to the inventor of this idea but puts a trademark and is marketing this revolutionary new hoisting concept.